Well Information
Operator: British Petroleum (BP) America
Location: Livonia, LA
Challenge
To dump and set a 40’ plug using a 2-1/8” SLB positive placement bailer within 7-5/8” casing at a temperature of 380 degrees Fahrenheit and at a depth of 19,000’.
Solution
Ultra Bond®
The 40’ plug plug was dumped and set over a two-day period, shutting down operations over night. Each morning before continuing cement dump bailer runs the TOC was tagged at the proper depth/height.
Results
After waiting 24 hours, an upper zone was perforated and completed.